Litio Store
Deye 99.12 kWp Solar Kit with 92.16–184.32 kWh Storage – 80 kW Three-phase Hybrid Commercial Industrial with Storage
Deye 99.12 kWp Solar Kit with 92.16–184.32 kWh Storage – 80 kW Three-phase Hybrid Commercial Industrial with Storage
Businesses and non-Italian private customers: 22% VAT applies. The 10% reduced rate is reserved for private individuals resident in Italy — learn more.
Foreign businesses entitled to 0% VAT: email info@litio.store.
Italy: €120. European Union: €350.
Deye 99.12 kWp Solar Kit with 92.16–184.32 kWh Storage – 80 kW Three-phase Hybrid Commercial Industrial with Storage
A three-phase hybrid solar system for grid-connected operation with energy management, storage, and backup, built around the Deye SUN-80K-SG02HP3-EU inverter, for industrial applications.
Kit contents
- 168 590W N-Type TOPCon bifacial dual-glass Silver Frame modules, for a total output of 99.12 kWp.
- 1 Deye SUN-80K-SG02HP3-EU-EM6 80 kW Three-phase.
- Selectable storage: Deye BOS-A (7.68 kWh modules) LiFePO4 38.4 V — 92.16 kWh (12× module) or 184.32 kWh (24× module).
- 1 AC solar panel, three-phase, 100 kW 160 A, with adjustable RCD and IP65 SPI.
- 1 DC solar panel, 8 strings, 8 MPPT, 1000 V, 32 A, with 8 SPD, IP66.
- 1 DC solar panel, 4 strings, 4 MPPT, 1000 V, 32 A, with 4 SPD, IP66.
Estimated solar configuration
Pre-sizing with modules in a 12×14 configuration. This is a preliminary commercial estimate: the final string configuration, MPPT voltage, and current limits must be re-checked against the datasheet of the inverter revision actually purchased and the site conditions (minimum design temperature).
Key features
- Grid-connected operation with storage and energy-flow management.
- LiFePO₄ batteries.
- Estimated delivery: 10–20 days.
Supply
The kit includes only the panels, inverter, the storage battery/batteries listed, AC panel, and protection DC panel listed. The PDU/BMS and system rack needed to assemble the battery modules are not included and must be ordered separately based on the number of modules. Mounting structures, cables, connectors, and installation are not included and must be sized by the installer based on the site. Installation and grid connection must be carried out by qualified personnel.
Share
