

Deye GE-F120-2H2 all-in-one storage system 122.8kWh 50kW LiFePO4 outdoor IP55
Everything is inside: 122.8kWh of LiFePO4 battery, the 50kW hybrid inverter with four MPPT trackers and 65kW of PV input, the BMS and the EMS, the air conditioner and the fire suppression, in an IP55 floor-standing outdoor cabinet. It works on-grid and off-grid, black starts and holds 50kW as a UPS too, with a 1.5x peak for ten seconds. Up to ten units run in parallel off-grid. Round trip efficiency up to 89%.
Technical data
| Item | Value |
|---|---|
| Nominal energy | 122.8kWh |
| Cell chemistry | LiFePO4 cells |
| AC power | 50kW nominal, 50kW in UPS mode, 1.5x peak for 10s |
| AC voltage and frequency | 220/380V or 230/400V three-phase, 3L/N/PE, 50/60Hz |
| AC current | 75.8A |
| PV power that can be connected | 65kW input |
| MPPT trackers | 4, 36A per input and 55A short circuit |
| MPPT voltage range | 150-850V, start-up 180V, nominal 600V |
| Battery voltage | 500-700V |
| Maximum efficiency | 97.6% inverter, 99.9% MPPT, 89% round trip |
| Dimensions (W x H x D) | 1780 x 2235 x 1056mm |
| Weight | 2090kg |
| Protection rating | IP55 |
| Operating temperature | -20 / +55 °C, derating above 43 °C |
| Cooling | built-in 2100W air conditioner |
| Fire suppression | aerosol on pack and system, water sprinkler, gas, smoke and temperature detection |
| Communication | CAN, RS485, WiFi, ethernet, Deye Cloud |
| Cycle life | over 6,000 at 70% remaining capacity |
| Warranty | 10 years |
| Declared certifications | UN38.3, IEC 62619, IEC 61000, VDE, CEI 0-21, EN 50549-1, UL 9540 |
| Product code | GE-F120-2H2 |
| Delivery | 3-4 months from order |
Documents
PDFOfficial Deye datasheetMade to order: delivery 3-4 months from the order, transport quoted on the delivery address. Design, installation and commissioning must be carried out by qualified personnel according to the applicable standards. Ask us for a quote on the full configuration, inverter or PCS included.



















































