Litio Store
Deye 15.15 kWp Solar Kit with 16–24.06 kWh Storage – 10 kW Three-phase Hybrid with Storage
Deye 15.15 kWp Solar Kit with 16–24.06 kWh Storage – 10 kW Three-phase Hybrid with Storage
Businesses and non-Italian private customers: 22% VAT applies. The 10% reduced rate is reserved for private individuals resident in Italy — learn more.
Foreign businesses entitled to 0% VAT: email info@litio.store.
Deye 15.15 kWp Solar Kit with 16–24.06 kWh Storage – 10 kW Three-phase Hybrid with Storage
A three-phase solar system with LiFePO₄ storage, built around the Deye SUN-10K-SG05LP3-EU-SM2 hybrid inverter, CEI 0-21 compliant and suited to grid-connected operation with energy management, storage, and backup.
Kit contents
- 30 Trina Vertex S+ 505W modules, for a total output of 15.15 kWp.
- 1 Deye SUN-10K-SG05LP3-EU-SM2 hybrid inverter, three-phase, with 2 MPPT, Wi-Fi, CAN, and RS485.
- Selectable storage: Deye SE-F16 Version C 16 kWh or 2 batteries Deye SE-F12 Version C for 24.06 kWh, with integrated BMS and CAN communication.
- 1 QACT10 AC panel, three-phase, 10 kW 20 A, with RCD and IP65 SPD.
- 1 DC solar panel, 2 strings, 2 MPPT, 900 V, 14–20 A, with thermal-magnetic breakers and IP65 SPD.
Verified solar configuration
The modules are arranged as 15 + 15 modules, one string on each of the 2 MPPTs. This configuration stays within the inverter's MPPT range (200–650 V), the 800V maximum DC voltage, and the input current limits for the selected Trina 505W modules.
The inverter includes a DC disconnect switch and Type 2 surge arresters on both the DC and AC sides; the included panel completes the grid-side protection.
Key features
- On-grid operation with storage and backup output.
- Deye low-voltage 51.2V LiFePO₄ batteries.
- Charge/discharge management via BMS communication.
- Estimated delivery: 10–20 days.
Supply
The kit includes only the panels, inverter, batteries, AC panel, and DC panel listed. Mounting structures, cables, connectors, and installation are not included and must be sized by the installer based on the site. Installation and grid connection must be carried out by qualified personnel.
Share
