Litio Store
Deye 18.18 kWp Solar Kit – 15 kW Three-Phase Hybrid (High Voltage), Commercial/Industrial
Deye 18.18 kWp Solar Kit – 15 kW Three-Phase Hybrid (High Voltage), Commercial/Industrial
Businesses and foreign private customers: purchase with 22% VAT. The 10% VAT rate is reserved for private individuals residing in Italy only — find out more.
Foreign businesses entitled to 0% VAT: write to info@litio.store.
Italy: €120. European Union: €350.
Photovoltaic kit Deye 18.18 kWp – hybrid 15 kW three-phase, high voltage, commercial/industrial
Three-phase hybrid photovoltaic system for grid-connected operation with energy management, built around the Deye SUN-15K-SG01HP3-EU-AM2 inverter, for commercial and industrial applications.
Kit contents
- 36 Trina Vertex S+ 505 W N-Type TOPCon bifacial Full Black modules, for a total output of 18.18 kWp.
- 1 Deye SUN-15K-SG01HP3-EU-AM2 hybrid inverter, three-phase, 2 MPPT.
- 1 three-phase photovoltaic AC panel, 15 kW, 25 A, with SPI CEI 0-21 and SPD, IP65.
- 1 photovoltaic DC panel, 4 strings, 4 MPPT, 1000 V, 32 A, with 4 SPDs, IP66.
Calculated photovoltaic configuration
Calculated configuration: 4 independent strings of 9 modules across the 2 MPPTs. Operating voltage Vmp 301.5 V, Voc at 25°C 362.7 V, conservative Voc at −25°C 406.2 V — within the inverter's 1000 V limit and inside the 150–850 V MPPT window. Module used: Trina Vertex S+ 505 W N-Type TOPCon bifacial Full Black (Vmp 33.5 V, Voc 40.3 V, Imp 15.09 A, Voc coefficient -0.24%/°C). DC/AC oversizing ratio: 1.21×. Preliminary configuration: must be re-verified against the datasheet of the revision actually purchased and against site conditions.
Key features
- Grid-connected operation.
- LiFePO₄ batteries not included in this configuration.
- Estimated delivery: 10–20 days.
Scope of supply
The kit includes only the panels, inverter, and AC/DC protection panels listed. Mounting structures, cables, connectors, and installation are not included and must be sized by the installer according to the site. Installation and grid connection must be carried out by qualified personnel.
Share
