Businesses and non-Italian private customers: purchase with 22% VAT. The 10% rate is reserved for private customers resident in Italy — find out more.
Foreign companies entitled to 0% VAT: please write to info@litio.store.
Deye 3U-LRACK 19-inch rack cabinet for 8 BOS-G battery modules and HV control box
The Deye 3U-LRACK is the 19-inch rack cabinet dedicated to the Deye BOS-G high-voltage storage system. It houses up to 8 BOS-G battery modules of 5.12 kWh each plus one high-voltage cluster control box, building a LiFePO4 battery bank of up to 40.96 kWh in a single tidy, easy-to-wire enclosure.
The modules plug into a standard 19-inch format, so installation is quick and maintenance or expansion is done module by module. The cabinet is designed for indoor use only and is the recommended mechanical base for larger residential and small commercial storage systems running at high voltage with Deye HV hybrid inverters.
Key features
Technical specifications
| Feature | Value |
|---|---|
| Product code | 3U-LRACK |
| Type | 19-inch rack cabinet for high-voltage batteries |
| Battery modules housed | 8 |
| High-voltage cluster control box | 1 dedicated slot |
| Compatibility | Deye BOS-G battery modules of 5.12 kWh (51.2 V - 100 Ah) |
| Energy with 8 modules | 40.96 kWh nominal |
| Chemistry of compatible modules | LiFePO4 |
| Format | plug-in modules in standard 19-inch rack |
| Dimensions (W×D×H) | 589×590×1640 mm |
| Cabinet weight | approx. 65 kg |
| Installation | indoor only |
| Protection degree of the BOS-G system | IP20 |
| Communication of the BOS-G system | CAN 2.0 / RS485 |
| Series configuration allowed by the BOS-G system | 3 to 12 modules |
| Cycles of compatible modules | ≥ 6000 (25 ±2 °C, 0.5C/0.5C, EOL 70%) |
| System operating temperature | charge 0 to 55 °C, discharge -20 to 55 °C |
| Certifications of the BOS-G system | CE, IEC 62619, VDE 2510-50, UL 1973, UL 9540A, UN 38.3 |
Documentation
PDFDatasheet batteria alta tensione 3U BOS-GOfficial manufacturer documentInstallation and wiring must be carried out by qualified personnel in accordance with the applicable standards and the electrical design of the system.