
Businesses and non-Italian private customers: purchase with 22% VAT. The 10% rate is reserved for private customers resident in Italy — find out more.
Foreign companies entitled to 0% VAT: please write to info@litio.store.
Deye 3U-HRack-2G White Battery Cabinet 13 Layers for BOS-G Batteries
The Deye 3U-HRack-2G battery cabinet in its 13-layer version is the supporting structure of the BOS-G and BOS-G Pro high-voltage storage systems. It houses up to 12 BOS-G-Pack5.1 battery modules plus the BOS-G-PDU-2 control box, that is a complete cluster of 61.44 kWh.
The white painted steel frame, 2,219 mm tall, provides rails sized for Deye 3U modules, a top bay for the PDU, tidy cable routing and a dedicated earthing point; a front door is available as an optional accessory. It weighs about 51 kg empty and must be installed on a flat floor indoors, since the system is rated IP20. It is the accessory to plan for whenever you build commercial or industrial storage with Deye three-phase hybrid inverters.
Key features
Technical specifications
| Feature | Value |
|---|---|
| Product code | 3U-HRack-2G (13 layer) |
| Type | Battery cabinet for Deye BOS-G and BOS-G Pro high-voltage systems |
| Layers | 13 (12 battery modules + 1 PDU) |
| Compatible battery modules | BOS-G-Pack5.1, 5.12 kWh each |
| Compatible PDU | BOS-G-PDU-2, 1 unit in the top layer |
| Max installable energy | 61.44 kWh (12 × 5.12 kWh) |
| System voltage when full | 528-700.8 V |
| Minimum configuration | 5 modules, 25.6 kWh |
| Scalability | up to 16 clusters in parallel |
| Module format | 3U |
| Dimensions (W × D × H) | 530 × 602 × 2,219 mm |
| Empty weight | approx. 51 kg |
| Colour | White |
| Front door | Available as an optional accessory |
| Installation | Floor standing, indoors (IP20 system) |
Documentation
PDFBrochure Deye BOS-G Pro (EU)Official manufacturer documentPDFManuale di installazione e uso BOS-G Pro (EU)Official manufacturer documentPDFGuida all'espansione BOS-G-Pack5.1Official manufacturer documentPDFCertificato di garanzia BOS-G ProOfficial manufacturer documentInstallation and wiring must be carried out by qualified personnel in accordance with the applicable standards and the electrical design of the system.