
Businesses and non-Italian private customers: purchase with 22% VAT. The 10% rate is reserved for private customers resident in Italy — find out more.
Foreign companies entitled to 0% VAT: please write to info@litio.store.
Deye BOS-A Battery Cabinet 11 Layers for HV Battery System
The Deye BOS-A 11-layer battery cabinet is the structure of the BOS-A high-voltage storage systems for commercial and industrial use: it houses 7 up to 10 BOS-A battery modules of 7.68 kWh plus the BOS-A-PDU-2 control box, for a complete cluster of 76.8 kWh rated and 69.12 kWh usable.
With a 610 × 610 mm footprint and 1,900 mm height it is the compact version of the range, made for technical rooms with limited headroom where the 14-layer cabinet does not fit. Fully loaded the rack reaches about 728 kg, so floor loading must be checked. Up to 16 racks can be paralleled and matched with Deye hybrid inverters and PCS from 50 to 100 kW. The cabinet itself weighs about 47 kg empty.
Key features
Technical specifications
| Feature | Value |
|---|---|
| Product code | BOS-A Rack 11 layers |
| Type | Battery cabinet for the Deye BOS-A high-voltage battery system |
| Layers | 11 (up to 10 battery modules + 1 PDU) |
| Compatible battery modules | BOS-A 7.68 kWh, 7 to 10 in series |
| Compatible PDU | BOS-A-PDU-2, 1 unit |
| Max installable energy | 76.8 kWh (10 × 7.68 kWh) |
| Usable energy when full | 69.12 kWh at 90% DoD |
| System voltage when full | 384 V nominal (10 modules in series) |
| Dimensions (W × D × H) | 610 × 610 × 1,900 mm |
| Empty weight | approx. 47 kg |
| Weight with modules | approx. 728 kg with 10 BOS-A modules |
| Racks in parallel | up to 16 |
| Matching inverters | Deye hybrid inverters and PCS from 50 to 100 kW |
| Ingress protection | IP20 (BOS-A system) |
| Installation | Floor standing, indoors |
Documentation
PDFBrochure Deye BOS-A Series (EU)Official manufacturer documentPDFManuale di installazione e uso BOS-A (EU)Official manufacturer documentPDFBrochure Deye Rack-Mounted Battery HV BOS-A SeriesOfficial manufacturer documentInstallation and wiring must be carried out by qualified personnel in accordance with the applicable standards and the electrical design of the system.