
Businesses and non-Italian private customers: purchase with 22% VAT. The 10% rate is reserved for private customers resident in Italy — find out more.
Foreign companies entitled to 0% VAT: please write to info@litio.store.
Deye BOS-A Battery Cabinet 14 Layers for HV Battery System
The Deye BOS-A 14-layer battery cabinet is the tall version of the structure for BOS-A high-voltage storage systems: it houses 11 up to 13 BOS-A battery modules of 7.68 kWh plus the BOS-A-PDU-2 control box, for a complete cluster of 99.84 kWh rated and 89.85 kWh usable.
With a 610 × 610 mm footprint and 2,350 mm height it uses vertical space to raise installed energy on the same floor area: with 13 modules in series the cluster voltage reaches 499.2 V nominal and the fully loaded rack weighs about 934 kg. Up to 16 racks can be paralleled and matched with Deye hybrid inverters and PCS from 50 to 100 kW. Where headroom is limited, the 11-layer version for 10 modules is available.
Key features
Technical specifications
| Feature | Value |
|---|---|
| Product code | BOS-A Rack 14 layers |
| Type | Battery cabinet for the Deye BOS-A high-voltage battery system |
| Layers | 14 (up to 13 battery modules + 1 PDU) |
| Compatible battery modules | BOS-A 7.68 kWh, 11 to 13 in series |
| Compatible PDU | BOS-A-PDU-2, 1 unit |
| Max installable energy | 99.84 kWh (13 × 7.68 kWh) |
| Usable energy when full | 89.85 kWh at 90% DoD |
| System voltage when full | 499.2 V nominal (13 modules in series) |
| Dimensions (W × D × H) | 610 × 610 × 2,350 mm |
| Empty weight | approx. 55 kg |
| Weight with modules | approx. 934 kg with 13 BOS-A modules |
| Racks in parallel | up to 16 |
| Matching inverters | Deye hybrid inverters and PCS from 50 to 100 kW |
| Ingress protection | IP20 (BOS-A system) |
| Installation | Floor standing, indoors |
Documentation
PDFBrochure Deye BOS-A Series (EU)Official manufacturer documentPDFManuale di installazione e uso BOS-A (EU)Official manufacturer documentPDFBrochure Deye Rack-Mounted Battery HV BOS-A SeriesOfficial manufacturer documentInstallation and wiring must be carried out by qualified personnel in accordance with the applicable standards and the electrical design of the system.