Deye 30.68kWp Solar Kit – 25kW Three-Phase Hybrid Inverter, Commercial/Industrial
Scalable solution for commercial and industrial sites, built to maximise self-consumption
🚚 Delivery in 10–20 days for modules and inverter; the AC (with CEI 0-21 interface protection) and DC protection panels have a 3–4 month lead time.
Commercial & Industrial Solar Kit
Three-phase hybrid PV system for grid-connected operation with energy management, designed around the Deye SUN-25K-SG01HP3-EU-AM2 inverter, for commercial and industrial applications.
| ☀️ 30.68kWp Solar | ⚡ PV Only No Storage | ⚡ 25kW Inverter | 🔌 Three-Phase Hybrid |
Kit Contents
52× 590W N-Type TOPCon bifacial double-glass Silver Frame modules
for a total output of 30.68kWp.
1× Deye SUN-25K-SG01HP3-EU-AM2 hybrid inverter
three-phase, 2 MPPTs.
1× Three-phase PV AC panel 30kW 50A with CEI 0-21 SPI, IP65
Protection and isolation of the AC grid connection.
1× PV DC panel 4 strings 4 MPPT 1000V 32A with 4 SPDs, IP66
Protection and isolation of the PV strings on the DC side.
PV String Design
Calculated configuration: 4 independent strings of 13 modules across the 2 MPPTs. Operating voltage Vmp 576.6V, Voc at 25°C 686.7V, conservative Voc at −25°C 769.1V — within the inverter's 1000V limit and within the 150–850V MPPT window. Module used: 590W N-Type TOPCon bifacial double-glass Silver Frame module (Vmp 44.35V, Voc 52.82V, Imp 13.3A, Voc coefficient -0.24%/°C). DC/AC oversizing ratio: 1.23×. Preliminary configuration: to be re-checked against the datasheet of the revision actually purchased and the site conditions.
Storage, Grid and Operation
- ✓Grid-connected operation.
- ✓LiFePO₄ batteries not included in this configuration.
A matched, well-engineered system
The kit uses selected components and a PV configuration sized to the inverter’s electrical limits, for a robust, consistent commercial or industrial system ready for installation by qualified personnel. The kit includes only the specified PV panels, inverter, and AC and DC protection panels. Mounting structures, cables, connectors and installation are not included and must be sized by the installer to suit the site. Installation and grid connection must be carried out by licensed personnel.