
Businesses and non-Italian private customers: purchase with 22% VAT. The 10% rate is reserved for private customers resident in Italy — find out more.
Foreign companies entitled to 0% VAT: please write to info@litio.store.
Deye BOS-G-PDU-2 PRO PDU/BMS Control Box for BOS-G Battery System
The Deye BOS-G-PDU-2 PRO is the high-voltage control box of the BOS-G Pro storage systems: it integrates the cluster master BMS, the power contactors, the protections and the DC disconnect, with LED indicators for live high voltage and alarms.
It works from 200 to 1,000 V DC at 100 A rated and 120 A peak, and manages 5 to 16 BOS-G-Pack5.1 modules in series, that is clusters from 25.6 to 81.92 kWh, with up to 16 clusters connected in parallel. It communicates with Deye three-phase hybrid inverters over CAN 2.0 and RS485. It uses the same 3U rack format as the battery modules and is installed in the top layer of the 3U-HRack-2G or 3U-LRack cabinet: one PDU per cluster is required.
Key features
Technical specifications
| Feature | Value |
|---|---|
| Product code | BOS-G-PDU-2 PRO |
| Function | Control box and master BMS for BOS-G Pro HV battery clusters |
| Operating voltage range | 200-1,000 V DC |
| Rated charge/discharge current | 100 A |
| Max charge/discharge current | 120 A |
| Auxiliary supply | 12 V ±2%, 4.15 A |
| Managed battery modules | 5 to 16 BOS-G-Pack5.1 modules (25.6-81.92 kWh) |
| Cluster voltage | 220-934.4 V |
| Clusters in parallel | up to 16 |
| Communication | CAN 2.0, RS485 |
| Status indicators | Yellow LED for live high voltage, red LED for alarm |
| Ingress protection | IP20 |
| Operating temperature | -20 to +65 °C |
| Dimensions (W × D × H) | 440 × 570 × 150 mm |
| Weight | approx. 19 kg |
| Format | 3U rack, for 3U-HRack-2G and 3U-LRack cabinets |
| Certifications | CE, CE-EMC, IEC 62040, VDE, UN38.3 (BOS-G Pro system) |
Documentation
PDFBrochure Deye BOS-G Pro (EU)Official manufacturer documentPDFManuale di installazione e uso BOS-G Pro (EU)Official manufacturer documentPDFGuida all'espansione BOS-G-Pack5.1Official manufacturer documentPDFCertificato di garanzia BOS-G ProOfficial manufacturer documentInstallation and wiring must be carried out by qualified personnel in accordance with the applicable standards and the electrical design of the system.