Skip to product information
1 of 1

Huawei

Huawei SUN2000-25K-MB0 Hybrid Inverter 25 kW Three-Phase

Huawei SUN2000-25K-MB0 Hybrid Inverter 25 kW Three-Phase

Regular price €3,528.74
Regular price Sale price €3,528.74
Sale Sold out
Tax included.
Scegli IVA
View full details
VAT note
Businesses and non-Italian private customers: purchase with 22% VAT. The 10% rate is reserved for private customers resident in Italy — find out more.
Foreign companies entitled to 0% VAT: please write to info@litio.store.
Delivery in 10-20 daysHybrid On-GridThree-phaseHuawei

Huawei SUN2000-25K-MB0 Hybrid Inverter 25 kW Three-Phase

The Huawei SUN2000-25K-MB0 is the 25 kW three-phase Smart Energy Controller of the MB0 series, designed for large homes and small commercial users with storage. It has 2 MPPTs with 4 inputs in total, a maximum voltage of 1,100 V, an operating range of 200-1,000 V and high currents (30 A per MPPT with two strings, 40 A short-circuit), for a recommended photovoltaic power of up to 37,500 Wp.

The storage interface features two battery terminals for the LUNA2000-5/10/15-S0 and LUNA2000-7/14/21-S1 (600-980 V DC), with charging power up to 21 kW on a single string and 25 kW on two strings, and discharging up to 25.0 kW. Maximum efficiency is 98.4% (98.2% European); Smart Air Cooling and the IP66 rating allow outdoor installation. Up to 3 units in parallel with Smart String ESS. Certified according to CEI 0-21:2020-12.

Key features

Three-phase hybrid 25 kW25,000 W rated and 27,500 VA maximum apparent power on a 230/400 V three-phase grid.
2 MPPTs and 4 inputsUp to 30 A per MPPT (two strings) and 40 A short-circuit current: ideal for high-current modules.
Dual battery terminalTwo high-voltage LUNA2000 storage strings (600-980 V), with up to 25 kW of charging power.
Discharge up to 25.0 kWStorage discharge power up to 25.0 kW, higher than the inverter's rated power.
98.4% efficiencyMaximum efficiency of 98.4% and European efficiency of 98.2%.
Up to 3 units in parallelWith Smart String ESS, up to 3 inverters can be connected in parallel for larger systems.

Technical specifications

FeatureValue
Product codeSUN2000-25K-MB0
ModelSUN2000-25K-MB0
TypeThree-phase hybrid inverter (Smart Energy Controller)
Rated AC power25.000 W
Max AC power27.500 VA (27.500 W)
Recommended max PV power37.500 Wp
Max PV voltage1.100 V
MPPT range200-1,000 V (start-up 200 V, nominal voltage 600 V); full-load range 530-800 V
Number of MPPTs2 (4 inputs in total)
Max current per MPPT30 A (with two strings) / 20 A (with one string)
Max short-circuit current40 A
Battery voltage600-980 V DC (high voltage)
Compatible batteriesLUNA2000-5/10/15-S0, LUNA2000-7/14/21-S1 (2 battery terminals)
Max charge/discharge current26.25 A per string
Max charge/discharge power21 kW on a single string / 25 kW on two strings when charging; 25.0 kW when discharging
Backup/EPS powerNot stated in the official datasheet consulted
Grid phaseThree-phase (3W/N + PE)
Grid voltage220 V / 380 V AC, 230 V / 400 V AC, 240 V / 415 V AC
Grid frequency50 / 60 Hz
Rated output current36.1 A (at 400 V AC)
Max output current39.9 A (at 400 V AC)
Harmonic distortion (THD)≤ 3 %
Power factor0.8 leading ... 0.8 lagging
Maximum efficiency98.4 %
European efficiency98.2 %
Protection ratingIP66
CoolingSmart Air Cooling (intelligent ventilation)
Units in parallelUp to 3 (with Smart String ESS)
CommunicationBuilt-in WLAN + FusionSolar app, RS485; Ethernet with Smart Dongle-WLAN-FE, 4G/3G/2G with Smart Dongle-4G or EMMA (optional)
Compatible optimizersSUN2000-450W-P2, SUN2000-600W-P, MERC-1100W-P, MERC-1300W-P
StandardsEN/IEC 62109-1/-2; grid codes IEC 61727, IEC 62116, IEC 61683, EN 50530, EN 50549-1, VDE-AR-N-4105, G99, CEI 0-21:2020-12 V1, C10/C11
Operating temperature-25 °C ... +60 °C
Dimensions (W x H x D)546 x 460 x 228 mm
Weight21 kg
WarrantyNot stated in the official Huawei datasheet

Documentation

PDFDatasheet SUN2000-25K-MB0Official manufacturer document

String sizing must respect the MPPT voltage and current limits and the electrical design of the system. Installation and grid connection must be carried out by qualified personnel in accordance with the applicable standards.