Skip to product information
1 of 1

GoodWe

GoodWe GW10K-ETA-G20 Hybrid Inverter 10 kW Three-Phase

GoodWe GW10K-ETA-G20 Hybrid Inverter 10 kW Three-Phase

Regular price €1,979.06
Regular price Sale price €1,979.06
Sale Sold out
Tax included.
Scegli IVA
View full details
VAT note
Businesses and non-Italian private customers: purchase with 22% VAT. The 10% rate is reserved for private customers resident in Italy — find out more.
Foreign companies entitled to 0% VAT: please write to info@litio.store.
Delivery in 10-20 daysHybrid On-GridThree-phaseGoodWe

GoodWe GW10K-ETA-G20 Hybrid Inverter 10 kW Three-Phase

The GoodWe GW10K-ETA-G20 is the 10 kW three-phase hybrid inverter module of the ESA storage system (high-voltage All-in-One): a single stackable solution in which the inverter and the lithium iron phosphate (LFP) batteries are integrated in the same cabinet. It features 4 independent MPPTs, a maximum PV voltage of 1,000 V with an extended MPPT range of 120-950 V, and accepts up to 20,000 W of installed photovoltaic power.

The battery works at high voltage (750 V nominal, range 700-950 V) with a charging power of up to 10.0 kW and a discharging power of up to 11.0 kW. The three-phase back-up output delivers 11.0 kVA (20.0 kVA for 10 s) and takes over with a transfer time of less than 4 ms. Maximum efficiency reaches 98.1% (97.2% European), the protection rating is IP66 with smart fan cooling, and connectivity includes Wi-Fi, LAN, Bluetooth, RS485 and CAN for the BMS as standard. Type II DC surge arresters (Type I+II optional) and Type II AC arresters are built in; AFCI and rapid shutdown are available as an option.

Key features

ESA All-in-One systemInverter module of the stackable GoodWe ESA storage system, with high-voltage LFP batteries integrated in the same cabinet.
4 MPPTs with 120-950 V rangeIndependent trackers (21/21/21/21 A) and PV voltage up to 1,000 V: up to 20,000 W of photovoltaic array.
Fast backupOn/off-grid transfer in less than 4 ms and emergency output of 11.0 kVA (20.0 kVA for 10 s).
High-voltage battery750 V nominal (700-950 V) with 10.0 kW in charge and 11.0 kW in discharge.
High efficiencyUp to 98.1% maximum efficiency and 97.2% European efficiency.
Connectivity and protectionsWi-Fi, LAN, Bluetooth, RS485 and CAN as standard; built-in Type II DC and Type II AC SPDs, IP66.

Technical specifications

FeatureValue
Product codeGW10K-ETA-G20
ModelGW10K-ETA-G20
Rated AC power9.999 W
Max AC power9.999 VA
Recommended max PV power20.000 W
Max PV voltage1.000 V
Start-up voltage150 V
MPPT range120-950 V
Rated PV voltage750 V
Number of MPPTs4
Max current per MPPT21/21/21/21 A
Max short-circuit current per MPPT26/26/26/26 A
Battery typeLithium iron phosphate (LFP), high voltage
Battery voltage750 V nominal (range 700-950 V)
Max charge/discharge current13,4 A / 14,7 A
Max charge/discharge power10,0 kW / 11,0 kW
Backup/EPS power10 kVA rated - off-grid 11.0 kVA (20.0 kVA for 10 s); with the grid present up to 43.5 kVA
On/off-grid switchover time< 4 ms
Grid phaseThree-phase
Grid voltage220/380 V - 230/400 V (3L/N/PE), range 180-260 V
Grid frequency50/60 Hz
Rated current to the grid15,2 A @ 380 V / 14,5 A @ 400 V
Max power drawn from the grid43.5 kVA
Power factor0.8 leading - 0.8 lagging
THDi< 3 %
Maximum efficiency98.1 %
European efficiency97.2 %
Surge arrestersDC Type II (Type I+II optional), AC Type II
AFCIOptional
Protection ratingIP66
CoolingSmart fans (smart fan cooling)
CommunicationWi-Fi, LAN, Bluetooth, RS485, CAN (BMS); optional 4G + Bluetooth
ProtocolsModbus-RTU, Modbus-TCP
User interfaceLED, app via WLAN
Operating temperature-35 °C ... +60 °C
Max altitude4.000 m
InstallationWall- or floor-mounted
Dimensions (W x H x D)800 x 340 x 270 mm
Weight34 kg
Warranty10 years for residential inverters manufactured from 1 January 2026 (5 years for earlier units), according to the GoodWe Limited Warranty

Documentation

PDFDatasheet GW10K-ETA-G20Official manufacturer document

String sizing must respect the MPPT voltage and current limits and the electrical design of the system. Installation and grid connection must be carried out by qualified personnel in accordance with the applicable standards.