
Businesses and non-Italian private customers: purchase with 22% VAT. The 10% rate is reserved for private customers resident in Italy — find out more.
Foreign companies entitled to 0% VAT: please write to info@litio.store.
FoxESS EPS-BOX PRO Three-Phase Backup Box 63 A for H3 Inverters
The FoxESS EPS-BOX PRO is the enhanced version of the three-phase transfer switchgear for the emergency power supply function in systems with FoxESS H3, AIO H3 and H3 Smart hybrid inverters. Compared with the standard version it handles up to 63 A per phase both on the input from the inverter and on the output to the priority loads, and is therefore suitable for large homes and small commercial users with high backup power.
It is housed in a sturdy metal enclosure with IP65 protection rating, for wall installation indoors or outdoors, with natural convection cooling. It integrates an RS-485 communication interface for connecting the energy meter, which is required to manage the exchange with the grid and self-consumption. In the event of a blackout it isolates the system from the grid and keeps the loads connected to the backup output supplied.
Key features
Technical specifications
| Feature | Value |
|---|---|
| Product code | EPS-BOX-PRO |
| Switchboard type | Three-phase EPS (backup) changeover panel |
| System side | AC |
| Rated voltage | 220/380 V – 230/400 V, 3L/N/PE |
| Rated frequency | 50/60 Hz |
| Number of phases | 3 phases + neutral + earth |
| Maximum input current (per phase) | 63 A |
| Maximum grid input current | 25 A per phase |
| Maximum load output current (per phase) | 63 A |
| Compatible inverters | FoxESS H3 / AIO H3 / H3 Smart |
| Communication | RS-485 for energy meter |
| Protection rating | IP65 |
| Enclosure | Metal |
| Cooling | Natural convection |
| Installation | Wall-mounted |
| Operating temperature | from −25 °C to +60 °C (derating from 45 °C) |
| Dimensions | 420 × 550 × 138.5 mm |
| Weight | 16.0 kg |
Documentation
PDFDatasheet EPS-BOX-PROOfficial manufacturer documentInstallation and wiring must be carried out by qualified personnel in accordance with the applicable standards and the electrical design of the system.