
Solis 15.15 kWp Solar Kit – 12 kW Three-Phase Hybrid Inverter, Commercial/Industrial
Scalable solution for commercial and industrial sites, built to maximise self-consumption
🚚 Delivery in 10–20 days for modules and inverter; the AC (with CEI 0-21 interface protection) and DC protection panels have a 3–4 month lead time.
Commercial & Industrial Solar Kit
Three-phase hybrid PV system for grid-connected operation with energy management, designed around the Solis S6-EH3P12K02-NV-YD-L inverter, for commercial and industrial applications.
| ☀️ 15.15 kWp Solar | ⚡ PV Only No Storage | ⚡ 12 kW Inverter | 🔌 Three-Phase Hybrid |
Kit Contents
30× Trina Vertex S+ 505 W N-Type TOPCon bifacial Full Black modules
for a total output of 15.15 kWp.
1× Solis S6-EH3P12K02-NV-YD-L hybrid inverter
three-phase, 2 MPPTs.
1× Three-phase PV AC panel 15 kW 25 A with CEI 0-21 SPI and SPD, IP65
Protection and isolation of the AC grid connection.
1× PV DC panel 3 strings 3 MPPT 900 V 14–20 A with MCBs and SPD, IP65
Protection and isolation of the PV strings on the DC side.
PV String Design
Calculated configuration: 3 independent strings of 10 modules across the 2 MPPTs. Operating voltage Vmp 335 V, Voc at 25°C 403 V, conservative Voc at −25°C 451.4 V — within the inverter's 1000 V limit and within the 200–850 V MPPT window. Module used: Trina Vertex S+ 505 W N-Type TOPCon bifacial Full Black (Vmp 33.5 V, Voc 40.3 V, Imp 15.09 A, Voc coefficient -0.24%/°C). DC/AC oversizing ratio: 1.26×. Preliminary configuration: to be re-checked against the datasheet of the revision actually purchased and the site conditions.
Storage, Grid and Operation
- ✓Grid-connected operation.
- ✓LiFePO₄ batteries not included in this configuration.
A consistent, well-engineered system
The kit uses selected components and a PV configuration sized to the inverter’s electrical limits, for a robust, consistent commercial or industrial system ready for installation by qualified personnel. The kit includes only the specified PV panels, inverter, and AC and DC protection panels. Mounting structures, cables, connectors and installation are not included and must be sized by the installer to suit the site. Installation and grid connection must be carried out by licensed personnel.